
COVENTRY STATION REDEVELOPMENT
Burgess Associates are currently part of the Electrical, Mechanical and Telecommunications Sub Contractors Team.
We will be providing Commercial Support to the team throughout the Scheme from Sub Contract Review to Final Account agreement.
The Project involves:
A second station entrance building providing step free access to platforms, creating five new shops
A second, fully glazed footbridge connecting all four platforms and extended platform canopies
A 644 space multi-storey car park to the east of Warwick Road
A bus interchange connected directly to the station building via a new access tunnel.
Road improvements – including a new link road to link to Central Six and the ring road and another to link to the new car park
A new bay platform to link with NUCKLE (the planned Nuneaton, Kenilworth to Leamington service) and allow better services to Nuneaton and the Ricoh Arena

LOCROS STATIONS – HANWELL, TAPWELL, IVER AND LANGLEY
Burgess Associates were part of the Electrical, Mechanical and Telecommunications Sub Contractors Team.
The Projects were part of the ongoing commitment by the Department for Transport for the provision of an accessible route at railway stations throughout the UK rail network this being the provision of an accessible route from a drop-off point to all platform levels.
Services include Electrical and Mechanical works along with CCTV, Passenger Help Points and PA Systems on a fully operational station.
We were brought into the Project at a later date to manage the Account and to formulate and issue Loss and Expense documentation including final resolution with the Client.
Other Schemes involved in:
Kidderminster Station – Compensation Event and Account Agreement.
Worcester Parkway – Loss and Expense Claim.
Holbeck – Compensation Event and Account Agreement.
Stechford – Loss and Expense Claim.

COMMERCIAL SUPPORT WORKS – RAIL
Burgess Associates provides commercial resource to a Principal Contractor who carries out a range of specialist services, focused on the needs of owners and operators of rail facilities and sidings. Our role was to initially assist with the resolution of legacy accounts and has now developed into a ongoing involvement with tender adjudications and commercial management of live projects.
The projects we have assisted with include the following;
Mersey Travel Upgrades (Kirkdale Depot, and Birkenhead North Depot)
Works:
Design, manufacture and install Carriage Wash Plant and Controls
M & E installation to new Office Block, Workshops, and Wheel Lathe Building
Service Apron water and power supplies
Design and install Depot Protection System
Design and install depot security systems including CCTV system
Design and install walkway lighting systems
Wigan Springs Depot
Works:
Design, manufacture and install Carriage Wash Plant and Controls
Design, manufacture and install automated Controlled Emission Toilets (CET) system
Design, manufacture and install automated Sanding Facilities
Design, manufacture and install fuel storage / dispensing facilities
Design, manufacture and install Ad Blue storage / dispensing facilities
Neville Hill Maintenance Depot
Works:
Design, manufacture and install automated Controlled Emission Toilets (CET) system
Design, and install all civils works including concrete bases and troughing
Howdon Depot
Works:
M & E installation to new Office Block and Engineering Workshops
Service Apron water and power supplies
Design and install points heating system
Design and install depot external lighting system, including all walkways and sidings
Design and install Depot Protection System
Design and install Depot warning system
Design and install depot security systems including CCTV system
Supply and install operational telephony